REAR®Renewable Energy
Association of Rajasthan
Contact REAR

REAR REGULATORY INTELLIGENCE

Policy & Regulatory Library

Find Rajasthan and India renewable-energy regulations, official orders, ministry guidelines and related REAR explanations. Search by subject, authority, document type and year.

RESEARCH BY QUESTION

From a regulation to a practical answer.

What does the order say?

Open the REAR-hosted official PDF when available. Check its date, number, subsequent amendments and whether it remains applicable.

What does it mean?

Read related REAR analysis for industry context. The signed PDF remains the regulatory source.

How can I participate?

Submit an evidence-based clarification or industry concern using REAR’s enquiry form.

Archived documents: REAR hosts official documents on its existing website and Cloudflare R2 as indicated. Original government download URLs are intentionally not displayed because they can change. Check document dates and subsequent amendments before relying on any archived text. Entries awaiting their PDF are clearly labelled.

SEARCH & FILTER

All regulations, orders and guidelines

12 curated records

Search renewable energy regulations, orders, guidelines and official documents

Browse Rajasthan and national electricity policy, energy storage, Green Energy Open Access and PM Surya Ghar guidance. Select a topic or search across every record. All available PDFs are REAR-hosted copies; check amendments and current applicability.

Search all documents

RERCRegulation

RERC Green Energy Open Access Regulations, 2025

RERC Regulation No. 158 dated 17 July 2025. Consult amendments and check the final notified text.

What this regulation covers

A regulatory framework for eligible consumers, renewable-energy developers and businesses seeking access to green electricity in Rajasthan.

  • Eligibility & applications: who may seek green open access and how requests are processed.
  • Metering & accounting: measurement, energy adjustment and settlement of electricity.
  • Charges & conditions: review applicable network charges, procedures and later amendments.
Rajasthan · Green Energy Open Access · Regulation

Updated REAR-supplied regulatory PDF. Please consult RERC amendments and orders for current requirements.

RERCRegulation

RERC Battery Energy Storage Systems Regulations, 2026

Regulation No. 164; read the official text for project and regulatory requirements

What this regulation covers

Battery storage project planning and system operation in Rajasthan.

  • System design & operation: Battery installations, integration and operating requirements to examine.
  • Safety & compliance: Applicable protection, commissioning and technical obligations.
  • Project participants: Considerations for developers, utilities, storage operators and EPC professionals.
Published regulation · Rajasthan · BESS / Storage

These articles cover the BESS industry and energy-storage policy; verify the precise obligations in the RERC regulation.

RERCRegulation

RERC Demand Flexibility / Demand Side Management Regulations, 2026

Regulation No. 165; review for demand-side and grid participation requirements

What this regulation covers

Demand flexibility and demand-side participation in electricity-system management.

  • Consumer participation: Demand-response or flexibility roles described in the RERC framework.
  • Measurement & verification: Check applicable monitoring, verification and reporting requirements.
  • Implementation responsibilities: Utilities, aggregators and eligible consumers should review the notified scope.
Published regulation · Rajasthan · Grid / Market

Related industry context only: these articles do not interpret this specific RERC demand-flexibility regulation. The CERC DSM framework is separate.

MNREGuidelines

MNRE PM Surya Ghar Scheme Guidelines, April 2024

Foundation guidelines; use with later operating guidance and amendments

What these guidelines cover

The starting framework for the PM Surya Ghar rooftop-solar programme.

  • Scheme participation: Eligibility and application procedures described in the original guidelines.
  • Financial assistance: Central financial assistance and related conditions to review.
  • Updates since 2024: Later implementation instructions may modify the original framework.
Historical foundation · India · PM Surya Ghar
Official PDF pending upload

The REAR articles discuss practical scheme and subsidy questions; check later MNRE revisions before applying the April 2024 guidance.

Rajasthan DISCOM — confirm on documentOrder / Guideline

Inverter Capacity up to Sanctioned Load

REAR’s archived order describes permission to install a solar inverter up to the sanctioned connected load even when solar PV capacity is lower. It also discusses choosing the next available lower inverter rating, within 20% of PV capacity. Verify the exact conditions in the order.

What this document covers

Practical guidance on matching inverter ratings with approved electricity load and solar PV capacity.

  • Inverter sizing: The order discusses capacity up to the sanctioned connected load.
  • Lower available rating: The supplied guidance also refers to a lower inverter rating within a stated 20% limit.
  • Consumer & vendor checks: Verify applicability, inverter availability and DISCOM approval requirements.
REAR existing archive — verify latest applicability · Rajasthan · PM Surya Ghar
View Official PDF ↗Original REAR archive · R2 copy pending

REAR commentary provides related background, not a legal interpretation of this exact order. Check applicable date and later revisions.

Rajasthan DISCOM — confirm on documentOrder / Guideline

No Separate Application for Load Extension under PMSGY

Under the supplied REAR order, when proposed solar PV capacity exceeds sanctioned load, the rooftop solar application also serves as the load-extension request. Review the applicable DISCOM workflow and conditions.

What this document covers

A simplified route when rooftop solar capacity exceeds the electricity connection's sanctioned load.

  • Application process: The solar application may also serve as a load-extension request.
  • Avoiding duplication: A separate load-extension application may not be required in qualifying cases.
  • DISCOM validation: Check current portal workflow and connection-specific conditions.
REAR existing archive — verify latest applicability · Rajasthan · PM Surya Ghar
View Official PDF ↗Original REAR archive · R2 copy pending

REAR commentary provides related background, not a legal interpretation of this exact order. Check applicable date and later revisions.

Rajasthan DISCOM — confirm on documentOrder / Guideline

₹2.71 per Unit for Existing Domestic Net Metering Consumers

The supplied historical order refers to ₹2.71 per kWh for domestic consumers with existing net-metering connections governed by the Rajasthan Net Metering Regulations, 2015 and amendments. Do not assume this is the current tariff without checking later orders.

What this document covers

A historical compensation order relevant to certain existing domestic net-metering consumers.

  • Recorded rate: The supplied order refers to ₹2.71 per kWh for qualifying connections.
  • Who it concerned: Domestic net-metering arrangements governed by the cited 2015 framework.
  • Current applicability: This rate must not be treated as today's tariff without later orders.
REAR existing archive — verify latest applicability · Rajasthan · PM Surya Ghar
View Official PDF ↗Original REAR archive · R2 copy pending

REAR commentary provides related background, not a legal interpretation of this exact order. Check applicable date and later revisions.

JVVNLOrder / Guideline

Application Fee, Security Deposit, Meter Testing and Net-Metering Agreement Waiver

JVVNL order dated 18 March 2025 waived the rooftop solar application fee, security deposit and meter testing charges for eligible domestic consumers, and removed the separate net-metering connection agreement requirement, subject to the order’s stated conditions and period.

What this document covers

Reduced procedural and financial barriers for eligible domestic rooftop solar consumers.

  • Fee relief: Application fee, security deposit and meter-testing charges in specified cases.
  • Agreement requirement: The separate net-metering connection agreement was removed for qualifying applications.
  • Scope and period: Read the JVVNL order's eligibility conditions and operative dates.
REAR existing archive — verify latest applicability · Rajasthan · PM Surya Ghar
View Official PDF ↗Original REAR archive · R2 copy pending

REAR commentary provides related background, not a legal interpretation of this exact order. Check applicable date and later revisions.

MNRE — source described by REARModel agreement

PM Surya Ghar Consumer–Vendor Model Agreement

Draft model agreement between a rooftop solar consumer and a vendor, described by REAR as issued by the Ministry of New and Renewable Energy. Confirm whether a later model or scheme-specific requirement applies.

What this agreement covers

A reference draft covering the relationship between a rooftop solar consumer and an installation vendor.

  • Scope of work: Project responsibilities and installation deliverables to document.
  • Payment & handover: Commercial terms and completion expectations that parties should review.
  • Current version: Verify whether the relevant scheme or state requires a newer agreement.
REAR existing archive — verify latest applicability · Rajasthan · PM Surya Ghar
View Official PDF ↗Original REAR archive · R2 copy pending

REAR commentary provides related background, not a legal interpretation of this exact order. Check applicable date and later revisions.

Rajasthan DISCOM — confirm on documentOrder / Guideline

Permanent Domestic Connection for a House under Construction

The supplied order describes granting a permanent domestic electricity connection for a self-constructed house under construction against applicant self-certification that electricity will be used for bona fide domestic purposes only.

What this document covers

Domestic connection guidance for a self-constructed house while building work remains in progress.

  • Consumer eligibility: The order concerns a permanent domestic connection in qualifying cases.
  • Self-certification: Applicant declaration of bona fide domestic electricity use.
  • Conditions: Check current DISCOM documentation and application requirements.
REAR existing archive — verify latest applicability · Rajasthan · PM Surya Ghar
View Official PDF ↗Original REAR archive · R2 copy pending

REAR commentary provides related background, not a legal interpretation of this exact order. Check applicable date and later revisions.

Rajasthan DISCOM / MNRE clarificationOrder / Guideline

DCR Certificate Not Required for PM Surya Ghar “Give It Up” Cases

REAR’s supplied implementation order describes acceptance of MNRE’s Give It Up clarification for non-subsidy rooftop solar consumers, including DCR-certification and ALMM List-II treatment. Verify the effective period and any later instructions.

What this document covers

A Rajasthan implementation clarification for rooftop solar consumers choosing the non-subsidy route.

  • Give-It-Up pathway: The guidance concerns applicants voluntarily foregoing subsidy.
  • DCR documentation: Review the stated certification treatment for applicable applications.
  • ALMM-II & effective dates: Check the order's scope against any later MNRE or DISCOM directions.
REAR existing archive — verify latest applicability · Rajasthan · PM Surya Ghar
View Official PDF ↗Original REAR archive · R2 copy pending

REAR commentary provides related background, not a legal interpretation of this exact order. Check applicable date and later revisions.

RERCRegulatory document

Rajasthan Virtual Net Metering (VNM) & Group Net Metering (GNM) — Regulatory Document

Source PDF linked from REAR’s Virtual Net Metering page. Covers Virtual Net Metering and Group Net Metering in the context of Rajasthan’s distributed renewable-energy regulatory framework. Refer to the document and subsequent official amendments for the applicable provisions.

What this document covers

Framework relevant to allocation of rooftop or distributed solar benefits across eligible electricity connections.

  • Virtual net metering: How qualifying generation benefits may be credited to designated connections.
  • Group net metering: Treatment of multiple eligible connections under the applicable arrangement.
  • Eligibility & accounting: Check connection categories, allocation and settlement conditions in the notified text.
Updated REAR-hosted regulation document · Consult subsequent amendments · Rajasthan · VNM / GNM

Read the REAR VNM/GNM guide for context and consult subsequent regulatory amendments and orders.

REAR EXPLAINS

Official PDF + REAR analysis.

Related REAR articles provide background and practical insights; they are not automatically specific interpretations of the listed regulation. Verified LinkedIn commentary by Aajay Yadav or REAR may be added with the original post URL. No commentary is presented as an official interpretation of RERC or MNRE.

ENQUIRE THROUGH REAR

Have a question about renewable energy?

Ask REAR about a scheme, project, policy issue or industry opportunity. Choose a REAR member if you want an equipment, EPC or I&C quotation.

Your enquiry will be submitted to REAR for review. Please provide information relevant to your request. Email notifications and referrals to individual members are not guaranteed.

Loading enquiry form…