What is PM-KUSUM?
PM-KUSUM, launched in 2019, supports solarisation of agriculture. The current framework comprises Component A for decentralised grid-connected solar plants, Component B for standalone solar pumps, and Component C for solarisation of existing grid-connected pumps and agricultural feeders. Its implementation period has been extended to 31 March 2027.
What is proposed under PM-KUSUM 2.0?
The proposed next phase has placed increased emphasis on agrivoltaics, which combines agricultural cultivation with solar generation on the same land. MNRE announced preparations for a dedicated agrivoltaics component in March 2026. Subsequent reports discussed different potential capacity targets. These are proposals at different policy-development stages, not finally approved targets. Final guidelines will determine eligible projects, capacities, subsidies and application procedures.
Component A: Decentralised solar power plants
Under the existing framework, eligible farmers, farmer groups, cooperatives and permitted participants can develop decentralised grid-connected solar plants, generally up to 2 MW per project subject to applicable rules. Power sales depend on DISCOM procurement, connectivity, tariff and power purchase arrangements. Component A is not an unconditional subsidy for every commercial solar project.
Component B: Standalone agricultural solar pumps
Eligible farmers can access solar-powered irrigation pumps through the applicable state implementation process. Technical selection must account for water source, discharge, total dynamic head, irrigation needs and approved equipment specifications.
Component C: Pump and feeder solarisation
Component C includes individual pump solarisation and feeder-level solarisation. Feeder projects may offer opportunities for DISCOMs and developers, but their viability depends on tender conditions, tariffs, power purchase agreements, grid infrastructure and financing.
Existing subsidy versus proposed new benefits
Under the established scheme, eligible standalone pumps and certain pump-solarisation projects in many states have generally used 30% central financial assistance and at least 30% state assistance, with the remaining amount arranged by the farmer, subject to benchmark costs, tender prices and state-specific rules. Special-category states may have different assistance structures. These rates must not be assumed to apply to every component or to the proposed PM-KUSUM 2.0 programme.
Agrivoltaics: Farming and solar on the same land
Agrivoltaic systems use suitable panel height, spacing and layouts to enable cultivation beneath or between solar arrays. Crop suitability depends on sunlight, shading, soil, irrigation, machinery access, climate and engineering design. Vegetables, horticulture and floriculture may suit some projects, but no universal crop list guarantees yield.
Can farmers lease land to solar developers?
A farmer may explore a permitted land lease or participation arrangement. Before signing, parties should verify title, land-use permissions, lease duration, payment escalation, agricultural access, irrigation rights, crop-damage liability, restoration duties and dispute resolution. Independent legal and financial advice is advisable.
Eligibility and application process
Eligibility depends on the component, state allocations, approved procurement procedure and applicant category. Potential participants include farmers, farmer groups, Farmer Producer Organisations, cooperatives, panchayats and eligible developers, but not every participant qualifies for every component. Applicants should check the official national portal and designated state implementing agency for current application windows and approved vendors.
Rajasthan opportunities and safeguards
Rajasthan stakeholders should assess solar pump demand, feeder-level solarisation, decentralised generation, agrivoltaic demonstrations, local operations and maintenance networks, grid connectivity and agricultural suitability. EPC firms and developers should monitor official tenders and technical eligibility rather than committing capital solely on the expectation of future subsidy.
What should developers and investors evaluate?
Key considerations include land rights, substation capacity, evacuation cost, electricity tariff, PPA terms, capital expenditure for elevated structures, financing costs, payment security, crop compatibility and long-term operations and maintenance. A policy proposal is not equivalent to an awarded project.
Avoid fraudulent registration claims
Farmers should verify registration and payment instructions through the official PM-KUSUM portal and state agencies. Do not pay unknown intermediaries claiming guaranteed subsidy approval or an open PM-KUSUM 2.0 registration window.
Frequently asked questions
Has PM-KUSUM 2.0 been launched? The next phase has been discussed and preparations announced; check official notifications for final guidelines and launch status.
Can farmers grow crops under solar panels? Yes, suitable agrivoltaic designs can allow continued cultivation, subject to crop and engineering feasibility.
Will PM-KUSUM 2.0 include battery storage? Future provisions for storage, eligibility and assistance must be confirmed through final government guidelines.
Can farmers earn income from electricity? Eligible projects may earn revenue through permitted power sale arrangements; returns depend on tariffs, generation, costs and contracts.
REAR perspective
The Renewable Energy Association of Rajasthan encourages transparent scheme implementation, clear technical and procurement guidelines, farmer safeguards, fair opportunities for eligible vendors and developers, and evidence-based agrivoltaic pilots. Official information: https://pmkusum.mnre.gov.in/. This article is informational and does not constitute an official government notification.