RAJASTHAN SOLAR EXPORTS AND THE NORTHERN GRID
The Indian Express reported on 28 October 2026 that the National Load Despatch Centre (NLDC), operated by Grid-India, wrote to CTUIL on 30 September requesting accelerated transmission augmentation. The reported letter identified high loading and N-1 security concerns at substations including Moga, Bhiwani and Jhatikara. The original letter was not independently obtained; these details are attributed to the newspaper.
WHAT N-1 SECURITY MEANS
N-1 is a power-system reliability criterion: a network should withstand the loss of one specified critical element, such as a transformer or transmission line, within applicable security limits. Exceeding a contingency limit does not necessarily mean equipment has failed or already exceeded its nameplate rating. Operators may restrict transfers proactively to preserve security.
REPORTED TRANSFORMER CONSTRAINTS
The Indian Express reports that Moga's two 1,500 MVA interconnecting transformers exceeded cited N-1 limits during solar hours. At Bhiwani, high loading reportedly persisted after an additional 1,500 MVA transformer was commissioned. These reports illustrate why transmission reinforcement must consider downstream lines, substations, protection and overall power-flow patterns.
WHY RAJASTHAN DEVELOPERS ARE AFFECTED
Electricity generated in Rajasthan flows through an interconnected transmission system to northern load centres. Constraints far from a solar plant can restrict evacuation and create commercial exposure. Developers should assess connectivity, transmission commissioning, contractual risk allocation and curtailment conditions before committing investment.
ILLUSTRATIVE CURTAILMENT ECONOMICS
A hypothetical 100 MW project curtailed by 20% for three hours per day over ten days would forgo 600 MWh, or six lakh units, if that output would otherwise have been generated and delivered. At an assumed ₹2.50/unit, indicative gross energy value is ₹15 lakh. This is not an estimate of any real project's loss or entitlement to compensation; actual consequences depend on irradiance, schedules, contracts and regulation.
WHAT SEPTEMBER DATA SHOW
JMK Research, analysing Grid-India data, reported 378.52 million units of variable renewable curtailment nationally in September 2026, with about 110 million units attributed to Rajasthan. JMK distinguished real-time constraints from emergency downward balancing. These categories should not be conflated or assumed to result from the same transformer bottleneck.
REAR'S POLICY RECOMMENDATIONS
Publish commercially useful constraint information while protecting security-sensitive details; align renewable commissioning with evacuation readiness; classify curtailment by cause; deploy storage only where it can address the actual constraint; disclose contractual risks clearly; and evaluate network upgrades against consumer cost and reliability benefits. These are editorial recommendations, not a representation that REAR has filed a formal petition.
FREQUENTLY ASKED QUESTIONS
What is N-1? The ability to withstand one specified contingency within applicable security limits. Does a violation mean a transformer failed? No. Why can Rajasthan solar be curtailed? Transmission and balancing constraints can limit transfers. Is compensation automatic? No; it depends on law and contracts. Will batteries fix all congestion? No; siting, duration and available transmission paths matter.
SOURCES, REAR RESOURCES AND CTA
Indian Express, 28 October 2026: https://indianexpress.com/article/business/green-energy-surge-demand-strain-north-indias-power-lines-transformers-10939768/ . JMK Research September 2026 analysis: https://jmkresearch.com/96-9-gw-of-solar-and-21-7-gw-of-wind-capacity-affected-by-curtailment-in-september-2026/ . Times of India, 23 October 2026: https://timesofindia.indiatimes.com/city/jaipur/solar-projects-told-to-cut-generation-by-20-as-state-struggles-limited-storage-capacity/articleshow/135126994.cms . Explore REAR policy resources and support at https://www.rear.org.in/ . EPCs, developers and manufacturers can share documented grid integration issues and consider REAR membership.