Rajasthan Discoms released the detailed Guidelines& procedure for Grid connected Solar projects

  • Writer: Wattscore® Energy
    Wattscore® Energy
  • Sep 25, 2021
  • 1 min read


ree



Net Metering is allowed up to 500 KW or up to sanctioned load (100%) , whichever is lower and the solar projects at particular transformer is allowed up to 50% of transformer capacity.