Rajasthan Discoms released the detailed Guidelines& procedure for Grid connected Solar projects
- Wattscore® Energy
- Sep 25, 2021
- 1 min read

Net Metering is allowed up to 500 KW or up to sanctioned load (100%) , whichever is lower and the solar projects at particular transformer is allowed up to 50% of transformer capacity.
Comments