top of page
Search
  • Writer's pictureWattscore® Energy

Rajasthan Discoms released the detailed Guidelines& procedure for Grid connected Solar projects






Net Metering is allowed up to 500 KW or up to sanctioned load (100%) , whichever is lower and the solar projects at particular transformer is allowed up to 50% of transformer capacity.

bottom of page